Permit Types
Oversize/Overweight Load Annual Permit (OO Annual) - City of Belleville ($310 /per hauling unit)
An Oversize/Overweight Annual Permit (O/O Annual) allows for the hauling of oversize/overweight loads during the period permitted, as defined by the Highway Traffic Act (HTA), that are within the specified maximum weights and dimensions permitted, and that are also subject to seasonal, fixed and temporary load restrictions.
Oversize/Overweight Load Trip Permit (OO Trip) - City of Belleville ($85 /per load)
An Oversize/Overweight Load - Trip Permit (OO Trip) is required for the transportation of a load(s) that exceeds the limits prescribed in the Highway Traffic Act (HTA), on a specific day(s), on a specific route, that is not already allowed for by a current Oversize/Overweight Load - Annual Permit (OO Annual).
Application may be made to multiple road authorities on a route with this service, by selecting the Multi-Jurisdiction option (coming soon).
Road Cut Permit - City of Belleville ($410)
A Road Cut Permit relates to any activity that involves the cutting, excavation, boring, filling, additions, or altering in any way, roadways, curbs, sidewalks, boulevards, ditches, trails, and other areas within the right-of-way.
The Road Cut Permit includes road occupancy within the work zone.
Drawings are to be in compliance with the Ontario Traffic Manual (OTM).
Road Entrance Permit - City of Belleville ($210)
A Road Entrance permit is required to add or reclassify a permanent or temporary road entrance at a specific location. The project of adding or modifying the road entrance may be subject to a Work in Right-of-Way permit that is associated with the Road Entrance permit.
Road Occupancy Permit - City of Belleville ($210)
A Road Occupancy Permit relates to any activity that results in traffic disruption, including bins, materials and equipment blocking lanes.
Drawings are to be in compliance with the Ontario Traffic Manual (OTM).